Case Study- Bayfield Mud Company

 

Introduction

According to the case study of the bag weight problem, therefore the control department gathered the weight bag as a sample from three different shifts (morning, afternoon, night) every day. As per given report the six samples collected per shift, therefore the size of the sample is six. To analysis the report of three different shift, we will apply x-bar chart and range chart.

Moreover we will take mean value i.e is 50, explanation given below. In addition we will also calculate the range chart figure for every samples in different shifts, which will be find out by applying formula (Largest-Smallest).

Analysis

D3(Value taken from Sigma table)=0

D4 (Value taken from Sigma table)==2.004

N(Sample Size)=6

Standard Deviation=1.2

Desired Control Limit 3Sigma =99.73%

Formulation

For X Chart

UCL x (Upper Control Limit for x bar) = X-Dbl Bar+Zx

Lower Control Limit (Upper Control Limit = X-Dbl Bar-Zx

x= is calculated by /Sqrt(n)

For R Chart

UCLR (Upper Control Limit for the Range) = D4*RBar

LCLR(Lower Control Limit for the Range)= D3*Rbar

Morning Shift

For X Chart

For R Chart

Samples

Time

Shifts

Average

Smallest

Largest

Range

X Bar (Averages)

49.80

R-Bar (CL)

3.45

1

6

Day 1 Morning

49.6

48.7

50.7

2.0

UCLx

51.27

LCL r

0.00

2

7

50.2

49.1

51.2

2.1

LCLx

48.33

UCL r

6.91

3

8

50.6

49.6

51.4

1.8

CL

50

4

9

50.8

50.2

51.8

1.6

5

10

49.9

49.2

52.3

3.1

6

11

50.3

48.6

51.7

3.1

7

12

48.6

46.2

50.4

4.2

8

1

49

46.4

50

3.6

9

6

Day 2 Morning

48.6

47.4

52

4.6

10

7

50

49.2

52.2

3.0

11

8

49.8

49

52.4

3.4

12

9

50.3

49.4

51.7

2.3

13

10

50.2

49.6

51.8

2.2

14

11

50

49

52.3

3.3

15

12

50

48.8

52.4

3.6

16

1

50.1

49.4

53.6

4.2

17

6

Day 3 Morning

48.4

45

49

4.0

18

7

48.8

44.8

49.7

4.9

19

8

49.6

48

51.8

3.8

20

9

50

48.1

52.7

4.6

21

10

51

48.1

55.2

7.1

22

11

50.4

49.5

54.1

4.6

23

12

50

48.7

50.9

2.2

24

1

48.9

47.6

51.2

3.6

Read also  Csr Practices In Maharatna Companies Of India Management Essay

Afternoon Shift

For X Chart

For R Chart

Samples

Time

Shifts

Average

Smallest

Largest

Range

X Bar (Averages)

48.93

R-Bar (CL)

4.38

1

2

Day 1 Afternoon

49

46

50.6

4.6

UCLx

50.40

LCL r

0.00

2

3

49.8

48.2

50.8

2.6

LCLx

47.46

UCL r

8.78

3

4

50.3

49.2

52.7

3.5

CL

50

4

5

51.4

50

55.3

5.3

5

6

51.6

49.2

54.7

5.5

6

7

51.8

50

55.6

5.6

7

8

51

48.6

53.2

4.6

8

9

50.5

49.4

52.4

3

9

2

Day 2 Afternoon

49.70

48.6

51

2.4

10

3

48.4

47.2

51.7

4.5

11

4

47.20

45.3

50.9

5.6

12

5

46.8

44.1

49

4.9

13

6

46.8

41

51.2

10.2

14

7

50

46.2

51.7

5.5

15

8

47.4

44

48.7

4.7

16

9

47

44.2

48.9

4.7

17

2

Day 3 Afternoon

49.8

48.4

51

2.6

18

3

49.8

48.8

50.8

2

19

4

50

49.1

50.6

1.5

20

5

47.8

45.2

51.2

6

21

6

46.4

44

49.7

5.7

22

7

46.4

44.4

50

5.6

23

8

47.2

46.6

48.9

2.3

24

9

48.4

47.2

49.5

2.3

Night Shifts

X Bar Chart

R Chart

Samples

Time

Shifts

Average

Smallest

Largest

R-Bar

X Bar Average

48.65

R- Bar (CL)

3.36

1

10

Day1 Night

49.2

46.1

50.7

4.6

UCLx

51.50

UCLr

6.73

2

11

49

46.3

50.8

4.5

LCLx

45.80

LCLr

3

12

48.40

45.4

50.2

4.8

CL

50

4

1

47.6

44.3

49.7

5.4

5

2

47.4

44.1

49.6

5.5

6

3

48.20

45.2

49

3.8

7

4

48

45.5

49.1

3.6

8

5

48.40

47.1

49.6

2.5

9

10

Day 2 Night

47.2

46.6

50.2

3.6

10

11

48.6

47

50

3

11

12

49.8

48.2

50.4

2.2

12

1

49.6

48.4

51.7

3.3

13

2

50

49

52.2

3.2

14

3

50

49.2

50

0.8

15

4

47.2

46.3

50.5

4.2

16

5

47

44.1

49.7

5.6

17

10

Day 3 Night

49.2

48.1

50.7

2.6

18

11

48.40

47

50.8

3.8

19

12

47.2

46.4

49.2

2.8

20

1

47.4

46.8

49

2.2

21

2

48.8

47.2

51.4

4.2

22

3

49.6

49

50.6

1.6

23

4

51

50.5

51.5

1

24

5

50.5

50

51.9

1.9

Read also  A business overview of Sulzer pumps

Analysis Report

   After calculating and analysing the three different shifts of three days. We can observe that second shift and third shift consistently out of control. Although, 21 Samples of range chart is only out of control which is 7.10 which is greater than UCLr which is 6.9. Despite, this is only shift which is in control.

  By observing the second shift it is clearly seen that x chart is out of control, whereas  R chart of second shift is in control only 13 Samples is out of control which is 10.20 whereas UCLr is 8.7842

  Now, for third shift, the X bar Chart the process is consistently out of control whereas the R chart is perfectly in control.

Recommendation.

In order to control the system, Company should be done some changes, mention below

  • In order to build up the productivity, training should be provide to the new employees especially in the night shift. Another solution company can shift experienced employee in night shift to maintain the balance.
  • Bayfield Mud Company should examine their machinery on regular basis as prescribed by managers. As we know a small issued can convert into big hindrance at the time of execution.
  • Company should hire some quality control specialist who can take proper responsibilities of audit and track every problems with all documents in efficient way.
  • Bayfield Company should do automated testing device to observe the bag weights.
Order Now

Order Now

Type of Paper
Subject
Deadline
Number of Pages
(275 words)