Company overview of Highco Engineers PVT Ltd Company background
Highco Engineers Pvt. Ltd. (HEPL) is a sheet metal auto components manufacturer, established in the year 1979 in the Adityapur industrial area in Jamshedpur. Jamshedpur was the first industrial city in India. Highco manufactures sheet metal stampings and fabricated assemblies for the automotive Original Equipment Manufacturers’ (OEM’s) in the country. It has seen an average growth rate of 53 % for the last 5 financial years. Equipped with the latest machinery & modern facilities that ensure high quality products, HEPL is a Tier I supplier of air tanks, cabin floor panels, centre bearing brackets for propeller shaft, cross members, deep drawn components, fuel tank, instrument panel, mud guard and wheel arch.
Organizational structure
Highco Engineers Pvt. Limited has five plants across India. Four of them are located in the Adityapur Industrial Area in Jamshedpur and the fifth plant is in Dharwad, Karnataka. However, the central office is located at Adityapur and each of the five plants is treated as a Strategic Business Unit (SBU).
The plant 1 and plant 2 at Adityapur are dedicated to the client Tata Motors. They manufacture components for the trucks of Tata Motors. They have a combined strength of about 300 workers operating in two shifts.
The plant 3 is the plant we have concentrated our study on. They manufacture sheet metal brake components for the client Wabco-TVS. The product line includes Non Pressure Plate Cylinder (Single and Double), Push Rod Assembly and Desecant Container. There are about 150 workers working in 2 shifts in this plant.
The plant 4 at Adityapur manufactures components for Tata Motors’ World Truck. The plant is still at its nascent stage and receives low volume orders only which are taken care by 20 workers.
The Plant at Dharwad manufactures equipments for Telcon. It employs about 30 workers.
In all, the company employs 500 workers out of which 200 are permanent and 300 are contract labors. The hierarchical organization structure at Highco is given below:
TM 3
TM2
TM 4
TM1
All the employees of Highco are divided into 4 groups:
TM1: This group includes the top management including the chief operating officer. The Director is responsible for the overall company whereas the COO takes care of the entire production as a whole. The performance allowance of the employees in this group can vary from Rs 0 to Rs 3500 depending on the grade achieved. Rs 3500 for an ‘A’ grade and Rs 0 for a ‘D’ grade.
TM2: This group includes the 2nd line employees including all plant managers. The performance allowance of the employees in this group can vary from Rs 0 to Rs 2500 depending on the grade achieved. Rs 2500 for an ‘A’ grade and Rs 0 for a ‘D’ grade.
TM3: This group includes the 3rd line employees including in charge of every department. The performance allowance of the employees in this group can vary from Rs 0 to Rs 1500 depending on the grade achieved. Rs 1500 for an ‘A’ grade and Rs 0 for a ‘D’ grade.
TM4: This group includes the 4th line employees including all operators. The performance allowance of the employees in this group can vary from Rs 0 to Rs 800 depending on the grade achieved. Rs 800 for an ‘A’ grade and Rs 0 for a ‘D’ grade
Product Profile
Following is an exhaustive list of all the products that Highco Engineers Pvt. Ltd. Manufactures for all its customers in the four plants:
Customer: HV Axles Ltd.
Customer: Tata Motors Ltd. (Jamshedpur)
Customer: Tata Motors Ltd. (Lucknow)
Oil Catcher
Floor Assembly
Floor Assembly (both left and right side)
Cover Rear Hub
Wheel Arch Assembly
Bumper Member Assembly
Cover Shorter Hub
Substructure Assembly
Tie Member Front Assembly
Front Axle Assembly
TTH Cross Member Assembly with Support
Floor Panel Assembly
Cover Rear Axle Hub
Engine Cross Member
Front Frame Assembly
Cover Rear Big Hub
Reinforcement
Customer: HV Transmissions Ltd.
Hub Cap Front
Rear Floor Assembly
Gear Box Cover Front
Front Brake Assembly Chamber (both left and right side)
Front Cabin Assembly
Cover
Cover Hub Inner
Floor Panel Assembly
WABCO-TVS (India) Ltd.
Front Frame Assembly
Push Rod Assembly
Substructure Assembly without Tie
Non Pressure Plate
Substructure Assembly without Support
Cylinder Assembly
Cabin Bracket Front Assembly
Desiccant Container
Frame Assembly Front
COMPETITORS
The company’s HR head considers the following as its main competitors:
• Automech Engineers
• Sandeep Engineers Works
• Utkal Engineers
• Accurate Engineers
Environment: The local auto ancillary industry
Locally, automotive ancillary companies are mostly present in the Adityapur industrial area. All these companies cater primarily to Tata Motors and Tata Cummins. There are about 500 auto components manufacturers who either directly or indirectly acts as suppliers to Tata Motors. About a year back, in November 2008, when Tata Motors stopped production in its heavy vehicle plant, altogether 50 ancillary units, which supplied various parts to Tata Motors and other firms, were shut down, while several others were on the verge of closure. Around 900 ancillary units had to cut their workforce by up to 40 per cent. Most of them started operating in only one shift a day rather than three.
The region is characterized by active industrial associations, like ‘Adityapur Small Industries Association (ASIA)’, and favorable industrial policy. Tata Motors insistence on high quality products makes it mandatory for its ancillaries to adhere to strict quality guidelines in all their products. Most of the ancillary units have 100% capacity utilization. Hence, quality & productivity is the rule of the game. The market could provide opportunities in the near future for catering to foreign majors setting up in India. However, competition is likely to increase. Auto giants could look for global outsourcing.
Major Challenges
Manpower Shortage: According to the top officials at the plant, shortage of machine operators is the biggest reason as to why they cannot meet their monthly targets. Acquiring skilled operators and retaining them is an issue with the plant as the Adityapur Industrial Area has a lot of potential job opportunities for the operators and they go where they get the best wages. Since the sheet metal workshop at Highco requires sufficient manpower to operate all the machines, any shortage in manpower directly affects the production.
Machine Failure: Although not very frequent, but machine failure also causes that particular assembly line or batch production to stop. The time taken to repair the machines is not much since the maintenance engineers are permanent employees of Highco and are present at the plant during all the shifts of production.
Dye Failure: Any dye used in production takes at least 15 days to make. Also it takes a long time to repair any damaged dyes. Improper use of the dye while production can cause damage to it thereby affecting production.
Improper Planning: On some occasions, planning at the end of the officials at Highco goes wrong in the sense that they might produce a particular part in greater numbers by shifting their man power to its production while ignoring the production of some other critical part. Even this leads to the targets not being met. The representative at Highco said that this has happened on a very few occasions till date.
Raw Material Shortage: Since Highco is dependent on only a single vendor, Tata Ryerson for its raw materials, there have been incidences in the past when they faced acute shortage of the raw materials hot rolling sheets which resulted in production to stop altogether.
Employee development: The current performance management system does not lay any emphasis on employee development. Over time the work will get very mundane and the motivation levels will drop. Money can’t be always used as the sole motivator. Also a measurement of employee development will aid promotion decisions. Emphasis on leadership development, communication skill development etc. is important.
ORGANIZATIONAL LEVEL DIAGNOSIS
The organizational level diagnosis was conducted by studying the company’s profile, its mission and statement of objectives. Also a study of the company’s environment was done as well as the industry structure was analyzed.
OUTPUT OrganizationalEffectiveness e.g. Performance, productivity & stakeholder satisfaction
INPUT
General Environment
Industry Structure
DESIGN COMPONENTS Technology
Strategy Structure
HR Systems Measurement Systems
Analysis of Inputs
General Enviroment
The environment of this company is characterized by a number of competitors trying to sustain themselves by capturing the largest share of a limited market. The levels of uncertainty in the market is very high as was seen when Tata Motors shut down its heavy vehicle plant, many auto component units suffered. This is because the market is limited to Tata Motors and Tata Cummins primarily. Also there is great uncertainty in the technological environment as with better technology, these auto majors can easily source their supplies from units which offer better quality products at cheaper prices. The economic environment is uncertain as well but many ancillary units are hoping on the entry of foreign majors so that market expansion can occur.
Industry Structure
The local auto ancillary market is highly competitive with a number of small and large players. These companies supply auto parts primarily to Tata Motors or Tata Cummins. The reliance on just two players for generating sales revenue has led to a highly quality focused set up of processes of manufacturing in these companies. Also the need to satisfy the high quality levels demanded by the Tatas has further made it imperative to have foolproof systems and practices which ensure high quality products. The strategy of these companies is to sustain by means of high productivity and quality. There is intense competition between these players as the market is limited but the number of competitors is many and hence the occurrence of substitute products is very high.
Analysis of the Design Components
Technology
The technology of the processes ensures that a high quality product is produced by the operators. The processes are designed such that there is a high level of interdependence in the manufacturing process. The level of uncertainty is kept to a minimum as the organization has implemented practices of Kaizen, Seiri and Seiton. Through these practices, discipline is built into the system and a spirit of team effort is fostered. Mistakes are corrected immediately and the systems are designed such that there is a high degree of standardization. Hence as the uncertainty is less in the system, the decision making process should be fast. But there are issues which the company faces such as poor communication between departments and hence this hampers the speedy decision making process.
Structure
The formal structure of the organization is based on the function – i.e. either Production or Sales etc. These departments have their own set of duties and responsibilities delineated. However at the same time there is a need for close coordination between the departments to ensure that the processes are aligned and that they result in a high quality product. This needs to occur especially between the Production and Quality Assurance departments. Despite the fact that the responsibilities of the departments are different from one another, there are many parameters which overlap in the performance appraisal form of the personnel in the different departments thus making some parameters irrelevant in nature to a particular department. Hence the integration of the departments ought to be done on the appropriate lines which ensure coordination of activities and not overlap.
Measurement Systems
The measurement systems are not very well defined in the organization. There is no clear channel of information flow. The measurement systems at the employee level need to be improved as the performance management system depends on self appraisal done by the operators but what the organization needs is involvement of the management levels in defining the overall goals of the business and using them as parameters of measurement. This involvement of the management will ensure accurate adherence to performance parameters and strategic objectives.
Human Resource Systems
The organization is in the process of establishing a new performance appraisal system which will implement the MBO system of determining performance levels and creating a rewards system based on the targets achieved at levels of the workforce. Also the organization is trying to implement an ERP system which will ensure complete alignment of all processes and provide more control over them. Previously the employee performance system depended entirely on the self appraisal generated by the employees themselves. The involvement of the management will ensure adherence to strategic objectives.
Strategy
The mission and overall objective of the organization is to offer a high quality product to its buyers and also sustain itself in the long term with a loyal dedicated workforce. Keeping this in mind the organization has implemented practices such as Kaizen etc which involve teamwork, group learning and also ensure the production of a high quality product. The organization is in the process of formalizing its processes and hence wants to implement systems such as ERP which will help greater control over processes and strict adherence to strategic goals.
Intermediate Output – Culture
The culture that is being fostered in the organization is wherein there is a lot of importance given to team work. This is formalized by practices such as Kaizen. Also any error on the part of a particular operator or any success of a specific person is shared between all the employees. This is part of the efforts of the organization to create an environment conducive to learning, cooperation and dedication to the work amongst employees.
Analysis of Outputs
The outputs from the organizational level diagnosis are firstly the overall performance of the organization. This organization was set up in the 70’s and has a number of plants across the Jamshedpur area. However the high growth in sales experienced by the organization before has been dwindling now due to various issues that have emerged in the operations such as employee development and planning etc. The productivity of employees and hence the company will be affected if measures are not taken to correct the issues faced by the employees. Also since the organization relies on a small basket of customers it is very necessary to keep a check on customer needs and ensuring that they do not lose market share to a competitor.
OD INTERVENTIONS
CONFRONTATION MEETING
Reasons for Implementation
One of the main pain points in the organization is the lack of proper coordination between the Production and the Quality Assurance departments. These two departments are absolutely critical in order to ensure the delivery of a high quality product to the customer. The current system is that the Quality department runs quality tests on one sample from a batch of units produced. If the one sample is found to be of good quality then the entire batch is passed. But this has led to some customer complaints and hence there have been suggestions to improvise the processes of conducting the quality testing. These changes have however not been incorporated correctly between the two departments. Both the Production and the QA department refuse to change their methods of operation leading to poor coordination and breakdown of communication between the two critical departments of the organization.
Confrontation meeting offers a speedy resolution to such conflicts and confusions post a change program and the results of the same are evident immediately as the issues are sorted between the members themselves.
7- Step Process
Climate Setting (45 min) – The top management sets the agenda for the meeting. The involvement of the top management generates credibility in the process and ensures the cooperation of all in the proceedings. They emphasize on free and open problem solving.
Information Gathering (1 hour) – In this step, heterogeneous groups are formed between the parties involved of approximately 7-8 people. These groups discuss the major issues at hand, the policies that have created them, the demotivating factors involved etc. All the group members offer their viewpoints on this and try to discuss ways in which the organizational objective can be taken forward and the overall goal be kept in perspective
Information Sharing (1 hour) – The groups come together to share their discussions. An overall summary of the points discussed are created. The overlaps are removed and a concise list of issues and their associated reasons are arrived at.
Group Action Planning (75 min) – The participants are split on the basis of their own natural groups. The groups discuss those precise issues which are pertinent to their department and suggest an action plan to address the same. They also identify specific issues that need to be focused on by the top management.
Organization Action Planning (2 hours) – Each group comes back and shares their views with the rest of the participants. The top management is a part of the discussion and they make note of the issues raised, the action plans suggested and the key focus areas suggested. Each unit then makes a communication plan which summarizes all the issues discussed and addressed for those who have not been a part of the meeting.
Immediate Follow – up by Top team (2-3 hours) – This is a very important step which establishes the credibility of the meeting and the discussions that have taken place. The top management prepares immediate plans to implement some of the action plans and makes commitments to others to review and implement them in the immediate future. This step ensures that the participants involved and the entire organization sees the process as a fruitful one as it has culminated in the implementation of some of their ideas.
Progress Review (2 hours) – This is conducted a few weeks later and involves a review of the progress made on the implementation of the action plans. This ensures that the implementation occurs successfully and that the departments see that their discussions have borne some fruit. This establishes a sense of trust and cooperation amongst members as their suggestions have been implemented and hence they gain a sense of control over their work processes.
GROUP LEVEL DIAGNOSIS
Group level analysis was done for employees belonging to the Production and Quality Assurance departments. Qualitative interviews were conducted amongst the employees belonging to both departments.
DESIGN COMPONENTS Goal clarity
Task identity Team
Functioning
Group composition Group Norms
OUTPUT
Team Effectiveness
INPUT
Organization Design
Analysis of the Design Components
Goal clarity
This involves how the well the group understands its objectives. The Quality assurance department’s goal is to identify any defects in the products and find out if the products are of the required quality specifications which the client required. The department runs quality tests on one sample from a batch of units produced. If the one sample is found to be of good quality then the entire batch is passed. The employees of this department are measured on the basis of the customer complaints and the defects which they have rightly spotted. The analysis revealed that the goals were understood by all members.
In case of the production department, the goal is to meet the production targets specified in the production plan and also ensure quality. The incentive system has a higher weightage for the number of units produced and as a result, quality seems to be taking a backseat with the production department trying to produce more and more. Here, the goal needs to be clearly understood by the employees as the quality focus is missing, which is evident from the increasing number of customer complaints.
Group performance norms:
These are member beliefs about how the group should perform its task and include acceptable levels of performance. According to them, the following are the performance norms on which the two departments function.
Department
Safety
Quality
Delivery
Cost
Morale
Quality assurance
–
No. of defects
On time delivery
Cost of measuring quality
Absenteeism, punctuality, number of meetings attended
Production
No. of accidents
No. of defects (PPM)
Percentage of successful delivery
Reduction in production cost
Absenteeism, punctuality, number of meetings attended
Task structure
This is concerned with how the group’s work is designed. Task structures vary along two dimensions:
Coordination of member’s efforts
Regulation of their task behavior
In the production department the operators have to perform limited activities. The task performed by one operator does not qualify as one independent unit and generally acts an input to another operator’s job. However, the coordination dimension seems to be very low as there seems to be very little interaction between the workers .As there is a fairly high degree of supervision among the workers, their freedom from external controls like supervisors is low, thus showing low regulation. The situation is no different in case of the quality assurance department.
Both the production and quality assurance team’s task structure include face-to face interaction during the weekly meetings. However, the team members feel that the supervisor is a bit too harsh on them and criticizes all the members for any non-adherence in the group meetings.
.
Group Composition:
Both the departments have a healthy mix of youth and experience. Majority of the group members are localites. All the members appear to have relevant task skills and experience. The head of Production department belongs to a different state and different culture and he admits that these cultural differences are in a way hindering his relationship with the employees. Also since the older people and younger people have different aspirations, there seem to be a lot of differences between the two groups, which was evident when both the groups accused each other of the reason behind the increase in customer complaints.
Group functioning:
How members relate to each other is important in work groups because the quality of relationship can affect task performance. In the quality department, the employees feel that they share a lot of good feelings and support each other. Probably, they are spending little time on task performance, which could be the reason for the increased customer complaints. In case of the production department, the members talk about dissatisfaction in the team meetings, and feel that relationships are strained, but fail to examine the underlying causes.
Analysis of Output:
The overall team effectiveness for the Production and Quality assurance teams is low. If one sample is found to be of good quality then the entire batch is passed. This has led to some customer complaints and hence there have been suggestions to improvise the processes of conducting the quality testing. These changes have however not been incorporated correctly between the two departments. As a result of this, both the Production and the QA department refuse to change their methods of operation leading to poor coordination and breakdown of communication between and within the two critical departments of the organization.
OD INTERVENTIONS:
The following team building intervention is recommended:
Role-negotiation technique:
The above method is recommended as the number of employees in each department is relatively small. This method will ensure that team building takes place and it leads to increased team effectiveness. The following steps need to be followed.
Contract setting
Focus only on behaviors-not feelings
What do you want others to do more / less of, maintain unchanged-or stop doing?
All expectations must be written.
No changes to be made without a quid pro quo following a negotiation
Focal role incumbent describes his expectations of others in the team.
Issue Diagnosis
Individuals think about how their own effectiveness can be improved if others change their work behaviors
Fill out Issue Diagnosis Form for every other person in the group listing what one wants others to do more of, less of, maintain unchanged, or stop doing
Exchange lists with other members
Influence Trade
Two individuals discuss the most important behavior changes they are willing to make on a quid pro quo basis. (“If you do X for me, I will do Y for you”)
Negotiations end when all parties are satisfied with their returns for whatever they are giving.
All agreements must be written down-to enable follow-up.
INDIVIDUAL LEVEL DIAGNOSIS
Individual level analysis was done for employees at level TM4 who are designated as operators. A sample of around 10 workers was taken, and the below interpretation has been done on the basis of the inputs provided by them and their in charge.
OUTPUT Individual Effectiveness job satisfaction, performance, personal development
INPUT
Organization Design
Group Design
Personal Characteristics
DESIGN COMPONENTS Skill Variety
Task identity Autonomy
Task Significance Feedback about results
Analysis of the Design Components
Skill variety
Since the operators are mostly involved in the manufacturing jobs where the tasks and activities performed by them are repetitive, the scope of using various skills is limited. Over time the work will get very mundane and the motivation levels will drop. This is already happening in the company and since no extra incentive in terms of learning and skill usage is given to the workers, they are switching to other companies leading to an increase in attrition rate in the company.
Task identity
Due to the nature of the products that the company manufactures and delivery pressures from the clients; entire process from procurement of raw materials to delivery has been defined and divided into various steps and departments. Even in production department the operators have to perform limited activities. The task performed by one operator does not qualify as one independent unit and generally acts an input to another operator’s job.
The company follows a concept called Seiton, or orderliness, which is all about efficiency. This step consists of putting everything in an assigned place so that it can be accessed or retrieved quickly, as well as returned in that same place quickly. If everyone has quick access to an item or materials, work flow becomes efficient, and the worker becomes productive. This example illustrates that even a small work like this is defined step by step to increase the efficiency.
Task significance
The job performed by one person acts as the input for another person hence the time required and the quality of one person’s job affects the final output in a significant way. Due a manufacturing set up the task significance for employees at level TM4 cannot be enhanced hence alternative ways have to be devised to make the employees feel important and required by the company.
The current performance management system does not lay any emphasis on employee development. There is total disregard for employee development causing the work to get mundane over time and giving no scope to move on to higher and more enriching jobs. Although financial measures are really effective at lower levels, it can’t be always used as the sole motivator. Also a measurement of employee development will aid promotion decisions. Emphasis on leadership development, communication skill development etc. is important.
It was also observed that there is no interaction of the module heads with the workers. The workers are not very clear of their long term goals and hence focus only on their immediate tasks. The job of the executives at this level is to motivate the workers and help them identify with the organization which is not happening here.
Autonomy
Since the day to day activities are almost routinized, the scope of autonomy does not exist at the lower level. Still, people at incharge level and superintendent level are allowed to suggest changes in the existing system.
An example where a department was given autonomy to improvise upon an existing process was in the quality department. The quality department has taken up some initiatives to improve the quality of the products. One of them was the initiation of CAPA (Corrective and Preventive Action) in order to foresee and prevent problems in future. Cross functional teams were formed for this purpose and the employees suggestions were considered and implemented.
Feedback
As of now the workers don’t get feedback on their performance and the workers are put to trainings only when they join the organization or when there is any change in the machines or processes. There is no provision for workers to get feedback on their personal development and apply for further trainings. Instead the feedback for the department as a whole is given. The monitoring takes place through review meetings and the feedback is also given in these meetings itself to the managers about their respective departments. In the current scenario where everyone looks for development opportunities along with the existing job, lack for trainings and development initiatives on part of the organization could be detrimental to the organization in the long term.
To solve such issues, a biannual feedback by the immediate supervisor to look at the development of the employee as a whole i.e. to decide training needs and identify areas for development can be carried out. They could also identify the workers personal development needs and incorporate them as and when feasible. The results of this feedback cum appraisal session can be used to identify candidates for promotion.
Along with the feedback from immediate supervisor the module heads can also be trained to take some future oriented steps to improve the performance, motivation and retention level of TM4 level workers.
Analysis of Output
The overall effectiveness and motivation level of employees at operator level is low. This has also caused an increase in absenteeism and attrition rate since the employees are made to do the same work every time without any difference in salary with respect to its competitors. Due to high attrition, overall recruitment cost has increased and the dip in performance of the employees is seen. Since individual level effectiveness affects the entire organization level output, it is imperative that steps should be taken to increase effectiveness at individual level.
OD INTERVENTIONS
Human process related OD interventions can be implanted to solve or mitigate the issues those were highlighted during the diagnosis stage. Some of the OD interventions that could be implemented are discussed below.
TRAINING AND DEVELOPMENT
Reasons for implementation
This intervention is one among the oldest and the most effective intervention if applied at proper time and place. In the given organization, the workers do not necessarily face the need of regular task related trainings but the personal development related trainings.
Due to the repetitive nature of the job and not much difference in salary levels as compared to the competitors the workers at the lowest level are losing incentive to stay with the company. Here the goal of the training would be the development of workforce so as to decrease attrition.
Application stage
Needs Assessment – The diagnostic model helps in assessing the existing situation of the organization at various levels. The individual level diagnosis showed that the employees need some personal development as an incentive to stay with the organization. To establish whether training is actually needed or not, needs assessment have to be done.
The OD practitioner needs to do the organization, work and individual assessment.
The organization level assessment will help to find out the reasons at systems level that may affect the ability to transfer the learning back to organization.
The work assessment will help in identifying the task and activities that the workers need to perform. Task analysis can be done to complete the work assessment stage. Job description of the employees and interview with the operators and the supervisors can be used to perform the task analysis. KSAs required for performing the task better and for employee development and promotion to the next level can be identifying through KSA analysis. The KSA analysis can be done with the help of the job holders and their incharge. Questionnaire can be floated to the incharge followed by interview with the operator and the supervisor in order to get the KSA details.
The individual assessment involves analysis to find out the level of KSAs that the worker currently has, so as to find out if any gaps exist between the required KSAs and existing KSAs. A questionnaire can be constructed to gauge the level of existing KSAs of the workers. An interview will help the practitioner to assess the training needs better. Also, it will help the practitioner to assess the personal development needs of the employees.
Develop the objectives and Design of the training – Before any training is conducted the objective or the expected output from the training should be highlighted. The trainings should be connected with the employee performance so that the ROI of the training can be easily calculated. Connecting the training to employee development and performance will also ensure that both the operators and their supervisors take the training seriously.
The objectives of the workers can be divided into 2 parts, performance objectives and flexible objectives. Performance objectives will objectively and quantifiably define the change in performance levels whereas the flexible objectives will be for the development purpose of the employee.
The design of the training would involve various aspects like design of the training content, facilities required for the training, training method, trainer, ways of measurement of training application, approximate ROI calculation etc. The training method may range from online training, on the job training, audio-visual or classroom training. Since, here the training is focuses on development of the employees; classroom training will prove to be more effective in the initial stages.
Deliver the training – This stage will be the exact implementation of the design in the previous stage. Proper schedule needs to be prepared for the training so that this training neither hampers the employees’ normal work schedules nor does it require the employees to stretch too much beyond the regular work hours. If the trainings require too much extra effort on part of the workers then they start considering the training as burden which needs to be avoided.
Evaluate the training – evaluation of effectiveness of the training is a very important step which is ignored by organization because of various reasons. Since, improvement in employee performance and retention may be due to many other factors it is essential to isolate the effect of other factors so as to get the true picture of the effect of the training.
First level of evaluation can be by taking a feedback from the workers regarding the training. If the workers perceive the training to be effective and satisfying their needs, then the next step of training evaluation can conducted. The next step of the training evaluation involves assessing the changes in the knowledge, skill and ability levels of the employees. This can be done through conducting tests and interviews. Training is ineffective if these KSAs are not translated into improved performance and hence improved results. The training should lead to the personal development of the employees along with an increase in performance and satisfaction.
Coaching
Reasons for Implementation
Coaching involves working with managers and executives on a regular basis to help them clarify their goals deal with potential stumbling blocks and improve their performance. Coaching, with its focus on the individual, emphasizes establishing the interpersonal relationship with the ability to create trust, communicate, listen and utilize powerful questions.
Coaching can help address a performance problem and also help in developing new behavioral skills as a part of leadership development program. This is the intention of this OD intervention at Highco Engineers Pvt. Ltd. Each of the Module Heads of Production, Quality Assurance, Sales and Tool Room are facing performance issues due to which they are not able to meet their targets. Improper planning results in a lot of production loss and sometimes even the quality of the product suffer. Coaching intends to clarify and establish the goals of the Module Heads so that they can not only do their own work in an organized and planned manner but also help their entire team consisting of superintendents, shift in charges and operators in performing up to their utmost potential.
The following steps are followed for coaching:
Establish the principles of the relationship: This initial phase would lay down the parameters of the relationship between the Module head and the OD practitioner such as schedules, resources and compensation. Since the Module Heads have a full 8 hour shift 6 days a week, the schedule for coaching would have to be restricted to just once a week. Since Saturdays are generally meant for meetings and planning, a 2 hour coaching session would be possible on this day. As it proceeds, the sessions can become once in two weeks. This stage should be utilized by the OD practitioner to create an amicable atmosphere where the client would become comfortable in sharing his performance issues unlike in a feedback session.
Conduct an assessment: In this phase, the OD practitioner needs to conduct a personal assessment of the Module Head that is the client. A 360 degree feedback would be the best tool to assess the client here as his performance is closely linked to both his superiors and subordinates and they can be the best judge of his personality as they spend at least 8 hours/ day with him. This personality assessment would lay a strong foundation for the coaching ahead.
Debrief the results: In this step, the OD practitioner would discuss the assessment data and come to a consensus on the diagnosis. The OD practitioner would give him proper feedback based upon interpretation of results. The main purpose of this session is to enable the Module Head to take action towards his goals. This would help him in realizing his potential and also identify areas of improvement on a personal level.
Develop an action plan: In this step, exactly the activities that the OD practitioner and the module head would engage in would be specified. This is the most difficult step in the process as in this methods should be decided and also a framework to monitor the progress and the effectiveness of the coaching process should be formulated.
New actions related to achieving the goal and building on the client’s skill set would be conceived as a part of this process. Based upon the goals, the steps to be taken towards achieving that goal is what is to be taken care of here. Since the Module Head of production faces trouble in proper planning at times, actions such as using Microsoft Excel to plan the production targets etc. might be of help.
Implement the action plan: In this stage, the OD practitioner has to confront, challenge and facilitate learning of the client. This would be done mainly in the one on one weekly meetings conducted with the client.
Assess the results: The OD practitioner and the client together would evaluate the results of the client’s actions every month. Based upon this information, the goals can be reviewed and the coaching can be stopped if not needed further.
Order Now