The following section looks at what bitumen satbilised materials are and how they are implemented in construction. As many aspects of bitumen emulsion and foamed bitumen overlap this section looks at them both together, which sub-sections outlining the differences between the methods.
Introduction
Bitumen Stabilised materials
Bitumen stabilized materials are materials which have been treated with either bitumen emulsion or foamed bitumen. When adding either type of bitumen the quantity of bitumen should not exceed more than 3% of the total mass of the dry aggregate, as this would mean it is more than a stabilizing agent. Furthermore in many situations an active filler in the form of cement or hydrated lime can also be added to the mix. If it is added however it should not exceed more than 1% of the bitumen stabilizer added. If it does the materials is considered to be cement treated.
It is also important to note that this stabilisation agent does not the material into solid asphalt like material. In undergoing this treatment the material will remain in a granular state similar to how it was before stabilisation. It is only its behavioral characteristics which will change. The material will experience an increase in material strength and a reduction in moisture susceptibility as a result of the manner in which the bitumen is dispersed amongst the finer aggregate particles.
The fact that the material will remain in a granular state means that this treatment method is dramatically different from all other pavement materials. The dispersed bitumen changes the shear properties of the material by significantly increasing the cohesion value whilst causing little change to the internal friction angle of the material. It will also have a void content similar to that of a granular layer, not like and asphalt.
Bitumen Emulsion
As the name suggest in this process bitumen is emulsified in water. This means that bitumen is dispersed in water, with the knowledge that they will not mix; due to the fact an emulsifying agent is used. The emulsifying agent will also give the bitumen emulsion a charge, making the bitumen emulsion either cationic or anionic.
This mixture is then added to the aggregate which will make up a part of the pavement structure. As the bitumen droplets are charged, they will be attracted to the aggregate particles. In attraction they will be drawn to the smaller particles as they have the greatest surface area and charge concentration features. For these reasons the type and moisture of the aggregate in the mix is crucial in efficiently dispersing the bitumen emulsion and preventing premature separation of the bitumen from the water during mixing.
Once it has been mixed the separation of the water from the bitumen needs to occur. This will allow the bitumen to act as a binder. This separation should only occur after the material has been fully compacted.
The mixing process involved with Bitumen Emulsion occurs offsite in a manufacturing plant. Here it is can be stored for several months. The diagram below shows a simplified version of the manufacturing process.
Foamed Bitumen
To produce foamed bitumen water is injected into hot bitumen, which results in instant foaming of the bitumen. In the foaming process the hot bitumen is turned into vapour, which is trapped in thousands of tiny bitumen bubbles. These bubbles dissipate in less than a minute.
When the bubbles burst they form tiny bitumen particles. These spread throughout the aggregate attaching themselves to the finer particles of the aggregate mixture. When the aggregate is compacted, the bitumen covered particles are pressed against the larger particles in the aggregate. As a resultant of this localized non-continuous bonds are formed, like spot welds.
Behaviour
As the material treated with bitumen will remain in an unbound state, it will act similar to the original material. The only difference will be an improved cohesive strength and reduced moisture sensitivity, which are both favorable outcomes. This is because the bitumen only disperses amongst the finer particles, which forms a bitumen-rich mortar between the coarse particles. This also means that opposite to the common misconception that the material will become black and sticky like a hot-mix asphalt. The material will only slightly darken in colour.
Through numerous tests around the world of bitumen stabilized pavements a number of initial observations on how the pavement will behave have been made. The following behaviours have been assumed.
Materials treated with either bitumen methods will experience an increase in cohesion.
The friction angle of the treated material will remain similar to the untreated material.
They obtain flexural strength. Which will mean the pavement is less likely to crack when subjected to tensile stresses.
Moisture sensitivity and durability are improved. This is due to the fact the finer particles are encapsulated and immobilized blocking flow channels.
The most common mode of failure is permanent deformation.
All these behaviors will depend on the following:
The local climate (Temperature, Average rainfall, likeliness of frost or snow)
The properties of the parent material
The density of the layer
The quantity of binder added
The use of any active fillers
The properties of the supporting material
It is important to note here that BSMs behave very different to asphalt and cement treated materials.
Benefits
There are a number of benefits associated with using BSMs. These include:
Increased strength
The ability to replace higher quality materials, meaning a cost saving
Improved durability
Improved moisture sensitivity
Can provide cost and time savings
Typical failure mode is permanent deformation, which requires less effort to rehabilitate when compared to a material that will fail due to full-depth cracking
They are not temperature sensitive
If the road requires rehabilitation BSMs propose little treat to the environment
They are not overly sensitive, meaning the amount of bitumen added can vary slightly
The process does not require heavy construction traffic. This limits the damage cause to newly constructed layers during construction
Limitations
When considering whether to use BSMs or not there are three main limitations. These should be carefully considered when making the decision to use BSMs. The three limitations are;
Economics – Bitumen treatment can add significant costs to a project. Its use of lower caterogory roads should be carefully examined as it could not be worth it.
Design Expertise – as they are currently been developed and act differently from all other pavement materials careful design is required.
Construction Expertise – the construction process requires attention to detail. This means special training of the work force is required.
Along with this limitations the both bitumen emulsion and foamed bitumen have their own disadvantages
Bitumen Emulsion
With bitumen emulsion come the following disadvantages
By adding the water present in the emulsion process, the original material may go over its optimum water content. This will mean the material cannot be compacted properly.
A quick setting time is required allow the material to gain sufficient strength
the construction process must be completed with care. If the bitumen breaks prematurely it will not mix properly. If the material is to stable it can take months for the bitumen to break
Foamed Bitumen
With foamed bitumen come the following disadvantages
it requires sufficient fines. They required to ensure the bitumen mixes thoroughly.
Foaming equipment needs to be up kept and be in correct working order. The foamed bitumen needs to be sprayed in uniform, consistent manner.
The process requires specialist equipment, as the two liquid are not compatible.
Materials Suitable for treatment
For bitumen stabilisation to work a suitable material must be selected. First of all the material must be granular. For this reason materials that are suitable for treatment include;
Crushed rock
Previously untreated natural gravels, such as basalt, granite, limestone, quartz, sandstone
Reclaimed asphalt
It can also be said that calcrete gravels can be used for bitumen emulsion; however it will not work with foamed bitumen.
Design Approach
Design Sequence
The first step in a typical design for a BSM involves an investigation of the conditions. This includes expected traffic volumes, the materials available, the climate and the pavement structure for recycling projects.
Once this has been done a laboratory investigation of the proposed material takes place. This involves determining the materials class.
The next step is to design the mix and make the final material classification.
Once all of these steps are completed the structural design is completed. In this design if it is shown that the road is not economically viable the mix design will be redone and the steps repeated.
Shown below is a flow chart of the steps involved.
Mix Design
In using a stabilizer it is important that the stabilizer meets its intended purpose. The process of design the mix will be mainly dependent of the design traffic, the material available and the cost considerations. However n creating a mix design it is also important to consider the following;
The primary failure mode – this will define the materials performance requirements.
Appropriate laboratory tests – tests need to be selected that will identify the key performance criteria and failure mechanisms.
Identifying key mix properties and intrinsic material properties.
Taking into account variability in material properties
Environmental factors – Climate and moisture conditions.
The ability to effectively compact the material.
In designing the mix it is important to note that optimum bitumen content is not always selected for the mix design. This is because although the optimum bitumen content will provide the maximum material strength, this will mean other characteristics are forfeited. For example a high strength design will often lead to brittle inflexible pavement layers that are susceptible to cracking. In designing the mix it is important that the design is balance so that it will be suitable to it requirements.
Classification of BSMs
Currently South Africa has divided Bitumen Stabilised Materials into three classes. These classes are dependent on the quality of the original material and the design traffic. The three classes include:
BSM1 – The parent material has a high shear strength, and is normally the base layer for large volumes of traffic. Source materials include well graded crushed rock or reclaimed asphalt.
BSM2 – The parent material has a moderately high shear strength and is normally the base layer for moderate traffic loads. Source materials include graded natural gravel of reclaimed asphalt.
BSM3 – The parent material is soil-gravel and/or sand, stabilized with higher bitumen contents. It is a base layer that can only handle low traffic volumes.
It is thought that Australia will have a classification system similar to this.
Mix design
BSMs behave in a very complex manner, which gives engineers a great flexibility when it comes to designing a mix that will best meet the design conditions. The mix is made up of aggregate, bitumen and sometimes an active filler where required.
In design the mix there are two fundamental failure mechanisms that need to be designed for in the mix these are;
Permanent Deformation – This is dependent on the materials shear properties as it is caused by the accumulation of shear stresses. Resistance to permanent deformation as known as rutting is improved by:
Improved aggregate angularity shape, hardness and roughness
Increased maximum particle size
Improved compaction
Reduced moisture content
Addition of limited amounts of bitumen
Addition of an active filler
Moisture Susceptibility – this is the damage caused by the exposure of a BSM to high moisture contents and pore-pressures caused by traffic. This then means a loss of adhesion between the bitumen and the aggregate. Due to water been involved in the mixing stage and the partially coated nature of the aggregate makes moisture susceptibility an important consideration in the evaluation of material performance. Moisture resistance is improved by
Increased bitumen content
Addition of an active filler
Improved compaction
Smooth continuous grading
It is interesting to note here the difference in recommended bitumen content. To help prevent deformation limited amounts of bitumen are recommended. However to improve moister resistance increased bitumen contents are recommend. This means that a compromise must be made, by using the laboratory testing to determine a bitumen content which will meet the demands of the design.
Mix type selection
As stated in sectionXX the three main factors the influence the type of BSM used are:
The design traffic
The quality of aggregate available
The cost
Once the type of BSM has been selected there are three main factors that affect the bitumen and active filler selection for the mix design;
Traffic design (volumes and loadings)
Climate (particularly moisture considerations)
Supporting layers (strength)
The influence these factors have is demonstrated in the following figure. As it can be seen heavy traffic loads, a wet climate and weak supporting layers all mean an increased amount of bitumen is required to ensure design requirements are meet.
Mix Design Procedure
To create the best design mix possible several procedural steps need to be done. This ensures that that every criteria is meet, as there are numerous variables that need to be checked.
The first step of the mix design is to test the material which will be treated. This is done to ensure that the material is appropriate for testing. These tests include standard laboratory tests to determine the materials grading curve, moister, density and Atterberg limits.
The next tests which are undertaken are the level 1 mix design tests. These provide an indication of the application rate of bitumen and active filler required to achieve an indicated class of BSM. Level 1 starts with the preparation of samples that will be used to manufacture the specimens required for all levels of mix design testing’s. testing at this level involves preparing 100mm diameter specimens which are compacted and cured for the purpose of undergoing Indirect Tensile Strength testing. These testing results are used to:
Indentify the preferred bitumen stabilizing agent
Determine the optimum bitumen content
Identify if there is a need for an active filler and its type
Tests after level 1 are done depending on the design traffic. The first of these are Level 2 mix design tests. The test at this level involves making a sample which is 150mm in diameter and 127mm in length. These are manufactured using vibratory compaction and then cured at the equilibrium moisture content. This sample then undergoes Indirect Tensile Strength to optimize the required bitumen content.
The level 3 mix design test is only recommended for high capacity roads. This test involves preparing 150mm diameter by 300mm in length specimens, which allows for a higher level of confidence. It then undergoes the same Indirect Tensile Strength test.
Mix Constituents
Aggregate
A wide range of mineral aggregates are suit for use with both types of bitumen treatment. These include aggregates ranging from sands to weathered gravels to crushed stone and can either be virgin or recycled. These must however fall into certain quality standards to ensure the road will be at it required class.
When examining a material its following properties will be checked:
Durability characteristics of the untreated aggregate
Plasticity
Grading
Spatial composition
Weathering characteristics
Aggregate source
The aggregate used can come from three different sources, Virgin Aggregate, Recycled Granular Layers and Reclaimed Asphalt
Quality of Aggregate
In using bitumen to stabilize the material it is possible to use a poorer quality of aggregate. For virgin aggregates four tests are used to identify material limits.
Soacked CBR
Grading – completing a grading will identify any deficiencies in the material
Percentage passing through the 0.075mm sieve – higher fines contents mean a higher need for bitumen
Plasticity Index – for bitumen emulsion the materials PI should be less than 7. For foamed bitumen the materials PI should be less than 10. Materials with a high PI can be treated with lime.
For recycled granular layers the materials quality will depend on:
The structure of the existing pavement
Construction variability
Depth of recycling
Age of the pavement
Degree of patching and repair on the existing pavement
Thickness and nature of old surfacing seals.
Using reclaimed asphalt needs serious consideration as some material may not meet the quality standards required. This is particular important on highly used roads, where traffic loads are going to be large.
When deciding whether the quality of the reclaimed asphalt will meet standards, the following needs to be considered.
Climatic region – if the material is going to be placed in a warm climate, shear tests must be carried out to represent that climate
Axle loads – high stresses will result in accelerated deformation of the road. This means that if the road is to carry heavy traffic its shear properties will need to be carefully considered
Reclaimed Asphalt Composition – if needed crusher dust can be added to the mix. This will provide an angular skeleton that will improve the mixes shear resistance.
Grading
The grading requirements for both types of bitumen stabilisation is different. This is due to the fact that the bitumen will disperse differently. The graph and table below give an indication of the grading required for each type of stabilisation.
XXXXXX
Bitumen Emulsion
As the above table shows a minimum filler content of 2% is required. This is because the bitumen emulsion will coat the large particles of the aggregate better than the foamed bitumen.
Foamed bitumen
Foamed bitumen requires more filler; approximately 5% filler content is required. This is because the bitumen droplets disperse through the material, only partially coating the large particles. It uses the filler to create a “spot welds” connecting the larger particles using the fines.
Bitumen Selection
The bitumen selected plays an important part in how well the BSM works. Penetration grade bitumen is used to produce both bitumen emulsion and foamed bitumen. In the next two sections the specific bitumen requirements for each form of stabilisation is given below.
Bitumen Emulsion
For bitumen emulsion base bitumen’s with a penetration value between 80 and 100 are normally selected. In saying this around the world softer and harder grades of bitumen have successfully been used.
In recent years there have been many technological advances which have allowed the bitumen emulsion to have improved stability without prolonging the break time. However sufficient testing of the bitumen mix needs to take place both in the mix design phase and during construction trials. This will ensure the correct bitumen has been chosen.
Another important consideration is the compatibility of the bitumen emulsion and the aggregate. This is because the type of bitumen chosen is influenced by the type of aggregate been treated. Certain materials are not suitable for catatonic treatment and others are not suitable for anionic treatment. The table below gives an indication of the compatibility of the emulsion with a aggregate.
Aggregate Type
Compatible with
Cationic Emulsion
Anionic Emulsion
Dolerite
Yes
Yes
Quartzite
Yes
No
Hornfels/Greywacke
Yes
Yes
Dolomite
Yes
Yes
Granite
Yes
No
Tillite
Yes
Variable
Basalt
Yes
Yes
Syenite
Yes
No
Amphilbolite
Yes
Yes
Marble
Yes
Yes
Rhyolite
Yes
No
Felsite
Yes
No
Sandstone
Yes
No
Andesite
Yes
Yes
Furthermore it is normally recommended that the undiluted bitumen emulsion is heated to between 50 and 60°C. This will prevent premature breaking of the bitumen emulsion while pumping in the construction equipment. It is also important to note here that when diluting the emulsion the emulsion must be added to the water. This will prevent premature breaking.
Foamed Bitumen
When it comes to foamed bitumen a softer grade of bitumen can be used without compromising stability. This is because foamed bitumen only requires low percentages of bitumen in the mix. However like bitumen emulsion typical penetration values are between 80 and 100. Harder bitumen is normally avoided due to the poor quality of foam it produces.
There are two main properties that determine the suitability of the bitumen for foamed bitumen stabilisation. These are its Expansion Ratio and its Half-Life.
The expansion raito is a measure of the viscosity of the foam. This is what determines how well the bitumen will disperse through the mix. It is calculated by finding the ratio between the maximum volume of foam in relationship to the original volume of bitumen.
The half-life is a measure of the stability of the foam and provides an indication of the rate of collapse of the foam during mixing. It can be calculated by determining the time it takes for the foam to collapse to half its maximum volume. The table below shows the minum limits of the expansion ratio and the half-life of the bitumen.
XXX
The greatest factor which will influencing the foam properties is the water injected into the expansion chamber. A greater injection of water will mean a higher expansion ratio, but this is offset by the fact it will mean a short half-life as the foam will subsided faster. Furthermore a higher bitumen temperature is usually recommended as it will create a better quality foam.
Active Filler
There are two types of fillers which can be used to improve the results of bitumen stabilisation; these are active and natural fillers. An active filler is a filler which will chemically alter the mix properties. There are various active fillers which can be used, examples of these are cement hydrated lime and fly ash. Natural fillers are fillers such as rock flour.
These fillers can be used either by themselves or in a combination with another filler. Their use will depend on their cost, efficacy during use and the materials availability. Research has shown that it is almost impossible to predict the effectiveness of a filler. The only way to gain an idea of their effect is to complete experiments using different mixes.
Active fillers are added to the bitumen in order to;
Increase the stiffness of the mix
Increase the rate at which the mix will gain strength
Improve the dispersion of bitumen in the mix
Improve adhesion between the bitumen and the aggregate
Improve the curing time of the compaction mix
Along with these general improvements, there are specific benefits for both treatments. For Bitumen Emulsion a filler will:
Control the breaking time of the emulsion
Improve the workability of the emulsion
For Foamed Bitumen a filler will:
Assist in dispersing the bitumen droplets
Natural fillers on the other hand only act as a supplement for a lack of fines in the material which is needed for dispersion.
It is important to note that when adding an active filler the time between the bitumen is mixed and it application is dramatically reduced. When an active filler is added the reaction begings immediately when it comes into contact with moist material. The longer the delay between mixing and application the less the filler will work.
Water
To ensure a high quality product it is important that the water used in mixing meets certain standards. Each technique requires different water qualities.
Bitumen Emulsion
For bitumen emulsion the pH levels of the water are extremely important. For cationic bitumen the water cannot be alkaline. If it is hydrochloric acid can be used to decrease the waters pH.
For anionic bitumen emulsion the opposite applies, the water cannot be too acidic. To make the water more alkaline lime or caustic soda can be added to the water.
Foamed Bitumen
The standards for foamed bitumen aren’t as high as they are for bitumen emulsion. It is acceptable for the water used to contain some impurities, however this should be avoided. This is because the water can affect the mixing machinery.
Specimen Preparation
Moisture
Moisture plays an important part in using bitumen to stabilize material. The role that moisture plays in the two types of BSM is explained in the table below.
Component
Bitumen Emulsion
Foamed Bitumen
Bitumen
Contributes to fluids for compaction
Does not effect
Moisture in aggregate
Reduces absorption of bitumen emulsion water into aggregate
Separates and suspends the fines making them available to bitumen during mixing
Prevents premature breaking
Acts as a carrier for bitumen droplets during mixing
Extends curing time and reduces early strength
Reduces early strength
Provides workability at ambient temperatures
Reduces friction angle and lubricates for compaction
Provides shelf-life for the mix
The term for the best moisture content in the material is the optimum mixing moisture content or OMMC. It is important to note that for bitumen emulsion this moisture value is the moisture in the aggregate plus the moisture from the emulsion.
The introduction of modern rollers has allowed for high energy compaction. In the case of BSM this means a lower fluid content can be used to produce the same quality of compaction. This has the added benefit of increasing the strength of the BSM.
Material Preparation
Below is the basic procedure for the material preparation involved in the mixing design.
Determine the grading curve of the aggregate and its optimum moisture content of the natural material
Determine the materials Atterberg Limits
Determine the moisture and density relationship of natural material to obtain optimum moisture content
Determine the moisture and density relationship of the treated material to obtain optimum moisture content
Determine the moisture and density relationship using vibratory hammer compaction to obtain optimum moisture content
Mixing
It is recommended that a pugmill mixer is used in both mixes. The use of different mixers can produce up to a 25% difference in strength. Experiments have found that the pugmill mixer provides the most comprehensive mix.
Compaction
Correct compaction of the material is extremely important as it reduces the voids and improves particle contact. The use of bitumen emulsion will help improve the compatibility of the mix, while the use of foamed bitumen will promote the adhesion of the bitumen mastic to the stone.
Curing
Curing is the process where the water is removed from the compacted layer. Water can be removed from either evaporation, particle charge repulsion and pore-pressure induced flow paths. The reduction in moisture content will lead to an increased tensile and compressive strength as well as add stiffness to the mix. The curing process is different for both methods
Bitumen Emulsion
It is chemistry that controls the way bitumen emulsion treated material cures. By removing the water from the mix breaking of the emulsion occurs. To do this the water is removed by means of evaporation and migration. This curing will take longer than foamed bitumen curing, due to the higher moisture contents.
Foamed Bitumen
The curing of the foamed bitumen is a natural process. It is cured through the migration of water during compaction and continues as the water is evaporated.
Testing
There are two main tests which are used to check the various mix designs, they are the Indirect Tensile Strength test and a Triaxial Test
Indirect Tensile Strength
This test is completed to measure the flexibility of the material and give an indication of its tensile strength. The table below gives a guide for interpreting the results of the test.
Test
Specimen Diameter (mm)
BSM1
BSM2
BSM3
Purpose
ITSdry (kPa)
100
>225
175-225
125-175
Indicates optimum bitumen content
ITSwet (kPa)
100
>100
75-100
50-75
Indicates need for active filler
ITSequil (kPa)
150
>175
135-175
95-135
Optimise bitumen content
ITSsoaked (kPa)
150
>150
100-150
60-100
Check value on ITSwet
Triaxial Test
This test is completed to meause the cohesion of the material, the friction angle and the retained cohesion. The table below gives a guide for interpreting the results of the test.
Test or Indicator
BSM1
BSM2
BSM3
Cohesion (kPa)
>250
100-250
50-100
Friction Angle (°)
>40
30-40
<30
Retained cohesion (MIST)
>75
60-75
50-60
Structural Design
As discussed in Section XX the structural layers purpose is to protect the subgrade by dispersing the traffic loads. This means that the pavement structure and subgrade must work together to ensure the required design capacity.
Construction
For both stabilizing methods once the material has been mixed into the material, the various construction operations are relavitivily the same as those if the material wasn’t treated. This includes the operations to place the material, cut levels, compacting the layer and finishing the layer.
Below is a chart showing the primary factors influencing the approach to construction.
As the chart shows there are five main construction methods that can be used with BSMs. these are broken into two sections, In Situ Treatments, which includes In Situ Recyclers and conventional plant which is only applicable to bitumen emulsion. The other section is In-Plant mixing which includes conventional plant, paver laid and labour intensive construction.
In Situ Treatment
There is now a wide range of new plant that have made the recycling process a lot easier. Along with the recycling machine, compactors, graders and water tankers are also needed. Each type of bitumen stabilisation requires a different set up.
Bitumen Emulsion
In situ treatment is mainly done using purpose built machines, which have replaced older style construction plant such as graders and ploughs. Although this is the case, Bitumen emulsion stabilisation can be done with either. When the purchase of a purpose built recycler cannot be justified, the older conventional type plant can be used to construct the road.
Foamed Bitumen
Foamed bitumen construction on the other hand is requires highly specialized equipment. This is because the foam needs to mix into the material in a short time period for the stabilisation to occur.
Application
Using a recycler the stabilized bitumen is added to the aggregate with the use of pumps which spray the bitumen over the material. When spaying the pumping system is controlled by a micro-processor, which is designed to monitor and adjust the application of the stabilizer. The mixing occurs in a milling chamber.
Compaction
When compacting the material usually three types of compactors are used. First a heavy primary roller, which can either be a padfoot or smooth roller, is used. This compacts the lower layers. The next compactor used is a smooth-drum roller, which is applied at a low amplitude vibration. This compacts the upper part of the layer. Once the layer is compacted to a satisfry condition, a pneumatic-tyred roller is used to finish the layer off. This roller allows for a tightly knit surface texture.
The graph below gives a selection guide to selecting the primary roller.
In Plant Treatment
There are a range of reasons why in-plant treatment may be used for a project. These include:
The stabilisation must have consistent quality.
The product needs to be stockpiled for use at a later date.
All aggregates are available at one location
The stabilizer is to be place using a paver.
In-Plant Mixing
The plant used to produce BSMs must be capable of:
Accurately blending predetermined proportions
Consistently producing a homogenous product
Bitumen Emulsion
In the case of bitumen emulsion relatively unsophisticated mixes can be used, without jeopardising quality. This allows for costs savings; on smaller projects a concrete mixer can be used. This can occur as long as the material is proportioned correctly and sufficient time is allowed for mixing.
Foamed Bitumen
Due to the fact that the foamed bitumen needs to be created on site the mixing plant needs to be more specialized. It needs to meet the following requirements
Needs to be micro-processor controlled
Needs a load sensor on the material feed conveyor
A continuously weighed auger
Must be able to maintain an operating pressure above 5 bars.
Paver
The use of a paver and screed to layer the BSM layer requires expertise to obtain a quality product.
When constructing with a paver and screed construction joints maybe required. These must be kept to a minimum however. This is best these joints may lead to weakness in the structure. They should also never be where they are trafficked wheel paths. Taking this into consideration large pavers is the best option, in either full or half-widths of the road.
A paver layer should be kept below 150mm, as it allows for better construction. This layer is normally compacted using a vibrating drum roller with a static mass of between 10 and 12 tons. It is important to note that a thicker layer will be more difficult to compact without rolling the surface out of shape. This is because coarser materials are more prone to segregation in thicker layers.
Bitumen Emulsion
In terms of layers bitumen emulsion can only have a single layer when paving. This is because water from the second layer would run into the original layer causing it to fail.
Foamed Bitumen
Foamed bitumen on the other hand can be successfully paved in two layers although it’s not recommended. Stringent controls are required to ensure that a vital bond is established between two layers making construction difficult.
Using Conventional Equipment
This is the preferred, rather than paved, method of construction when it comes to in-plant mixed materials. This is because it allows for thick layers of BSM to be laid. Which the use of conventional equipment there are two main limitations
Thick layers can only be constructed in full widths.
Moisture can be lost due to the material been spread over large areas.
These two limitations mean that this method is not appropriate for bitumen emulsion as this method requires additional moisture. It also limits the application of the foamed bitumen.
Labour Intensive Methods
BSMs can also be laid using labour intensive methods. However layers will be kept to a maximum of 125mm as the material cannot be laid quicker enough to have larger layers. Moisture loss is also a problem due to the slow rate of construction.
It’s due to its physical limitations that the use of labour intensive methods are only recommended for smaller jobs, where it the disadvantages can be offset by cost savings.
Curing and Trafficking
Curing is a relatively quick process when it comes to BSMs. The strength of using BSMs is in the fact that they can withstand traffic loading soon after the layer has been completed. When it comes to rehabilitation work recycling is normally done in half-widths with unidirectional traffic been allowed through with the use of traffic control.
Bitumen Emulsion
Before the layer is ready for traffic the bitumen emulsion must first break. This increases the cohesion which is required for resistance. The compaction alone which increases the density isn’t sufficient to ensure resistance to traffic damage.
The break normally takes a few hours at the surface, where evaporation will force the break. The bitumen emulsion deeper in the layer will take up to a few days.
Foamed Bitumen
Once compaction is complete the layer will experience an increase in cohesion which will make the bitumen resistant to traffic damage. At this stage however the bitumen will still remain tender until the moisture content reduces.
Surfacing
A benefit of using BSMs is the early strength the layer is able to gain. This is from the bitumen increase the cohesion between the particles, which allows the roadway to withstand traffic without surfacing. This is however not recommended for more than 4 weeks. This is because the heavy tyre loads imposed on the road will tend to loosen and remove the coarser particles at the surface which will cause roughness. By surfacing the road between 2 and 4 weeks are compaction the likelihood of this occurring is reduce, as well as providing protection against excessive traffic abrasion and water ingress.
It is recommended that an asphalt surfacing, which is around 30mm thick, be used on BSM layers. This is because South African research has proven that the asphalt is extremely durable on the BSM layers
Environmental Effects
Bitumen Emulsion
Advantages
Disadvantages
Improves Shear Strength
Reduces Permability
Flexibility – means greater resistance to deformation
Ease of Application
Standard test methods are availiable
Expensive
Moisture Effects – where the pavement is close to OMC, saturation will occur
Curing – Takes a long time
Availability
Foamed Bitumen
Advantages
Disadvantage
Improves Shear Strength
Reduces Permeability
Flexibility – means greater resistance to deformation
Ease of Application
Rate of Strength Gain
Lower moisture contents required incomparison to bitumen Emulsion
Ready for traffic almost immediately
Can be carried out in situ
Cost
Foamed bitumen demands that bitumen is hot – Requires specialized equipment
Purpose built equipment required for construction
Not suitable for all pavement types
Has not been fully researched
Cement
Advantages
Disadvantage
Availability
Cost
Ease of Application
Acceptance
Shrinkage cracking is unavoidable
Increases rigidity in flexible pavements
Cannot be trafficked immediately